Ahmed Boutamo, Pr. Dr-Eng., PhD. Independent researcher and strategic advisor, Paris, France. ORCID 0009-0000-2145-1765 (https://orcid.org/0009-0000-2145-1765). Correspondence: aboutamo@gmail.com. Website: https://boutamo.org
Status: working paper, submitted or to be submitted for peer review. A French version of the argument appears in the author’s book L’Équation hyperstatique. Dette publique et capacités de transformation économique (2026).
Abstract
Governments that carry large stocks of commitments often report that they can no longer act, even when resources exist. This paper gives that complaint an exact and measurable form. Borrowing from structural mechanics, we define the degree of hyperstaticity of a policy problem as the number of independent targets minus the rank of the Jacobian of the instruments that commitments leave free. We show that a positive degree makes almost every target locally unattainable, derive a closed-form measure of how far a target lies from the attainable set, and give the exact intensity a new instrument needs to reopen a blocked direction, which depends only on its component orthogonal to existing instruments. An effective, threshold-based version of the degree is robust to estimation error in the multiplier matrix by Weyl’s inequality. We then embed the idea in a dynamic model of public investment with absorptive capacity and a debt ceiling at every date. Better conversion of preparation spending into execution capacity monotonically enlarges the viability kernel, and preparation enters the capacity-maximising programme if and only if its conversion rate exceeds the squared ratio of absorptive capacity to planned investment. In a calibrated illustration the threshold formula gives 0.0993 against a numerical optimum of 0.0994, and a capacity target that no allocation of a fixed budget can reach without preparation becomes reachable once conversion exceeds about 1.05. We outline a regression discontinuity design based on the French 100 million euro counter-appraisal threshold to estimate the key parameter.
Keywords: policy instruments and targets; Tinbergen rule; controllability; viability theory; public investment efficiency; absorptive capacity; fiscal space
JEL codes: E61, E62, H54, H63, C61
1. Introduction
This paper turns the intuition that a heavily committed economy “cannot move” into a quantity that can be computed, bounded and tested. High public debt, statutory spending, tax ceilings set by political acceptability and social floors each remove degrees of freedom from fiscal policy. The resulting situation is rarely one of absolute scarcity. Resources exist, but the instruments that could still be moved no longer span the directions in which policy needs to move.
Structural engineering has a precise word for a system with more constraints than its equilibrium equations can absorb. A beam clamped at both ends is hyperstatic, and its degree of hyperstaticity counts the redundant supports. We use the analogy in a disciplined way. A policy problem is hyperstatic when the number of independent targets exceeds the number of independent directions that free instruments can still produce. The degree of hyperstaticity counts the missing directions.
The counting idea is old. Tinbergen (1952) showed that policy requires at least as many independent instruments as targets, and Preston (1974) and Aoki (1975) extended the condition to dynamic models through the controllability rank of linear systems (Kalman, Ho and Narendra, 1963). The contribution of this paper lies elsewhere, in four results that make the counting operational for economies under commitments.
- A commitment-adjusted rank measure. We separate nominal from free instruments, so that legal, political and financial commitments enter the computation explicitly, and define the degree
(Definition 1 and Proposition 1).
- A distance and an opening formula. We measure how far a target lies from the attainable set and show that a new instrument reopens a blocked direction if and only if it has a non-zero orthogonal component, with a closed-form intensity (Propositions 2 and 3). Instrument power and instrument novelty are distinct.
- Robustness. A threshold version of the degree is invariant to estimation error smaller than the spectral gap, which makes the concept estimable from multiplier studies (Proposition 4).
- Instruments as produced capacity. In a dynamic model where preparation spending builds absorptive capacity with a lag and debt is capped at every date, better conversion monotonically enlarges the viability kernel (Proposition 5), and preparation enters the optimum exactly when its conversion rate exceeds the squared ratio of absorptive capacity to planned investment (Proposition 6).
The last result yields a sharp and falsifiable prediction. The marginal value of project preparation should rise with the square of the ratio between planned investment and execution capacity. It also explains why preparation that improves the end state of a programme can still be rejected when the binding constraint is the peak of debt during the transition.
All numerical results are synthetic and serve to verify the algebra and to size the mechanism. They are not estimates for any country. Section 2 reviews related work. Section 3 develops the static measure and Section 4 illustrates it. Section 5 introduces the dynamic model and its viability results, and Section 6 computes the viability frontier. Section 7 derives testable implications and an identification strategy, and Section 8 concludes.
2. Related literature
The paper connects four literatures that rarely meet, namely the theory of economic policy, viability theory, public investment efficiency and project appraisal.
Targets and instruments. Tinbergen (1952) established the counting rule, and Mundell (1962) showed that the assignment of instruments to targets matters for stability. Preston (1974) and Aoki (1975) generalised the rule to dynamic linear systems, where the relevant object becomes the controllability matrix of Kalman, Ho and Narendra (1963). We take the rank formulation as given. What we add is the explicit removal of instruments frozen by commitments, a metric notion of distance to the attainable set, the opening formula for a new instrument and a robustness result that links the measure to estimated multipliers.
Viability. Aubin (1991) defined the viability kernel as the set of states from which at least one evolution respects state constraints forever, and Aubin, Aubin-Frankowski and Lozève (2024) apply viability to monetary and economic theory. Our dynamic notion of hyperstaticity is a state lying outside the kernel for the available instruments. The new element is a monotone comparative static in the parameter that converts preparation into execution capacity, and a closed-form entry threshold.
Public investment efficiency and absorption. Pritchett (2000) showed that cumulated public investment effort is not capital, and Gupta et al. (2014) built efficiency-adjusted public capital stocks that differ widely across countries. Buffie et al. (2012) model investment, debt and absorptive constraints jointly in low-income countries, and Gurara et al. (2020) estimate that unit costs rise with the scale of public investment. Leeper, Walker and Yang (2010) show that implementation delays change the macroeconomic effect of government investment. Abiad, Furceri and Topalova (2015) find that the output effect of public investment depends on efficiency. Collier (2010) argued for “investing in investing”, that is, building the capacity to invest before investing. Our model formalises this idea with an explicit budget, a lag and a debt ceiling at every date, and derives when it pays.
Irreversibility and appraisal. The value of waiting and information under irreversibility is established (Bernanke, 1980; McDonald and Siegel, 1982; Dixit and Pindyck, 1994). Large projects suffer systematic cost overruns and delays (Flyvbjerg, Bruzelius and Rothengatter, 2003), and project outcomes depend on both country and project factors (Denizer, Kaufmann and Kraay, 2013). These results motivate treating preparation as a capacity-building input whose return must be estimated rather than assumed.
The idea of a binding constraint that masks others echoes growth diagnostics (Hausmann, Rodrik and Velasco, 2008). Our measure gives it a matrix form, in which the missing direction is identified by the orthogonal complement of the image of the free Jacobian.
3. The degree of hyperstaticity
3.1 Set-up
Let collect
policy targets and
collect
instruments. Around a reference point, the local response of targets to instruments is linear:
An instrument is frozen over the decision horizon when it cannot be moved, because of a legal commitment, a bound already reached or a documented acceptability limit. Let denote the set of free instruments and
the
submatrix of their columns. Frozen instruments are not absent from the economy. They are absent from the set of directions policy can use.
Definition 1 (degree of hyperstaticity).
The policy problem is isostatic when , hyperstatic when
and redundant when
. The degree
counts the directions of target space that no combination of free instruments can produce. Unfreezing an instrument or creating a new one can only lower
, never raise it.
3.2 Hyperstaticity makes almost every target unattainable
Proposition 1. If , the set of locally attainable target changes,
, is a linear subspace of dimension
. It has Lebesgue measure zero in
, so for almost every
the system
has no solution.
Proof. has dimension
. A proper linear subspace of
is closed with empty interior and Lebesgue measure zero. Hence the set of targets without a local solution has full measure.
The result is local. Box bounds on instruments turn the attainable set into a zonotope inside , which only shrinks it, so Proposition 1 holds a fortiori. Large non-linear changes are treated in Section 5.
3.3 Distance to the attainable set
The rank says whether a target can be met, not by how much it is missed. Let be the orthogonal projector onto
.
Proposition 2 (inaccessibility gap). The minimal Euclidean miss of a target using free instruments is the norm of its component orthogonal to the attainable subspace:
When , let
be the unit normal to the hyperplane
. The gap then reduces to
.
Proof. The least-squares problem is solved by the orthogonal projection of onto
, and the residual is
. When
the orthogonal complement is spanned by
, so
.
Targets must be normalised before the gap is compared across domains, since inherits their units.
3.4 Opening a blocked direction
Suppose a new instrument becomes available, with marginal effects . It may be a new policy, the unfreezing of an existing one or, as in Section 5, a capacity built by spending.
Proposition 3 (opening condition and intensity). Adding to the free instruments lowers
by one if and only if
. When
, the target
becomes exactly attainable and the required intensity of the new instrument is unique:
Proof. if and only if
, that is, if and only if
. For
, premultiply
by
. Since
is orthogonal to every column of
,
. If
this fixes
, and the remaining vector
lies in
, so
exists.
We call the opening index. It separates instrument power, the norm of
, from instrument novelty, its orthogonal share. A powerful instrument that duplicates existing ones opens nothing, and the intensity it would need grows as
.
3.5 Robustness to estimation error
In practice is estimated from multiplier studies, and an estimated matrix almost surely has full rank even when the true one does not. A threshold version of the degree is therefore required. Let
be the singular values of
.
Definition 2 (effective degree at threshold ).
Proposition 4. Let the estimate satisfy . If no true singular value lies in
, the effective degree computed on the estimate equals the true effective degree.
Proof. By Weyl’s inequality for singular values, for every
(Golub and Van Loan, 2013). A true value above
stays above
, and a true value at or below
stays at or below
.
The proposition makes the concept estimable. Given multipliers with confidence bands, one can report together with the range of thresholds over which it is stable. A diagnosis that changes with a small move of
signals a near-collinear instrument set rather than a clean hyperstatic structure.
4. A three-objective illustration
A stylised example shows that two frozen instruments are enough to make the recovery direction itself unattainable, and that a preparation instrument with an opening index of 0.69 restores it. All coefficients are hypothetical and chosen only to verify the algebra.
The three normalised targets are the primary balance, productive capacity and the residual income of the first decile after essential spending. Four instruments exist nominally. Taxation is frozen at an acceptability bound and current spending by statutory commitments.
Table 1. Hypothetical marginal effects (author’s construction, no estimation).
| Target | Tax (frozen) | Current spending (frozen) | Investment | Targeted transfer |
| Primary balance | 0.90 | −1.00 | −1.00 | −1.00 |
| Productive capacity | −0.20 | 0.10 | 0.60 | 0.05 |
| Residual income, first decile | −0.40 | 0.30 | 0.05 | 1.00 |
With all four instruments has rank 3, with singular values 2.2037, 0.7522 and 0.2303, and the problem would be isostatic. With the two free instruments the rank falls to 2 and
. The blocked direction is
, a simultaneous improvement of all three targets, which is precisely the recovery a government seeks.
Take the target , which improves the balance and capacity without hurting the poorest decile. Its inaccessibility gap is
, and the least-squares residual has the same norm. No combination of investment and transfers attains it.
Now add a preparation instrument with effects . It costs the balance but acts strongly on capacity. Its projection on the blocked direction is
and its opening index is
. The degree drops to zero, and Proposition 3 gives
. Solving the full system confirms this value, with investment at
and transfers at
, and a linear feasibility programme confirms that all intensities lie within an illustrative box of
. The negative investment entry means that, in this example, preparation raises capacity enough to release investment in favour of the balance.
Finally consider an alternative instrument , almost collinear with investment. Its projection
is only 0.0196. The rank is formally 3 again, but the smallest singular value is 0.0138 and the required intensity exceeds 31 in absolute value. The problem is formally isostatic and practically hyperstatic, and
for every threshold above 0.0138.
5. Dynamics: execution capacity as a produced instrument
5.1 The model
We now let the opening instrument be built rather than given. A programme is described relative to a baseline by three states at the start of period : additional productive capacity
, absorptive capacity
and additional real debt
. Decisions are preparation
, investment
, a maintenance intensity
and support transfers
. The states evolve as follows:
The saturation term caps realised capacity at
when investment outruns absorption, in line with the evidence that unit costs rise with investment scale (Gurara et al., 2020). Preparation decided at
raises absorption only at
. Capacity built during a period produces revenue
only from the next period, so no revenue is anticipated. The parameter
converts one unit of preparation spending into absorptive capacity. It is the dynamic counterpart of the opening index of Section 3.
5.2 Viability and dynamic hyperstaticity
Fix a horizon , an envelope
on cumulative preparation and investment, a debt ceiling
and a capacity target
. A programme is admissible if
at every date, the envelope holds and
. The set of initial states from which an admissible programme exists is the viability kernel (Aubin, 1991). An economy is dynamically hyperstatic when its state lies outside the kernel for the instruments it can use. This replaces the counting of directions by the existence of trajectories while keeping the same meaning: commitments demand more than adjustment capacities can deliver within the time available.
5.3 Better conversion always enlarges the possible
Proposition 5 (monotonicity in ). Assume the net fiscal yield of capacity is positive,
. For any fixed sequence of decisions, raising
weakly raises
and
and weakly lowers
at every date. Consequently the set of admissible programmes expands with
, the minimal debt peak needed to reach a given target is non-increasing in
, and the maximal capacity reachable under a given ceiling is non-decreasing in
.
Proof. By induction on .
is non-decreasing in
, and each later
inherits the order since
. The map
is non-decreasing in
for
, and
preserves the order of
. In (8),
enters with coefficient
, and
preserves the order of
. Any programme admissible at
therefore remains admissible at every
.
The practical consequence is that a credible lower bound on delivers a guaranteed inner approximation of the viability kernel. Parameter uncertainty translates directly into a conservative frontier.
5.4 When preparation enters the optimum
Consider the programme class used in the simulations, with preparation in period 0, investment
and
in periods 0 and 1, and the envelope
. Let
maximise terminal capacity
without preparation, and suppose this optimum is interior with
.
Proposition 6 (entry threshold). A small amount of preparation raises maximal terminal capacity if
and does not raise it if the reverse strict inequality holds.
Proof. At the interior optimum without preparation, the first-order conditions equalise the discounted marginal products of and
with the multiplier
of the envelope. The marginal product of
in period 1 is
. A unit of preparation raises
by
and the capacity built in period 1 by
, at a cost of one unit of envelope, worth
. Both effects reach the horizon through the same depreciation factor
. Preparation improves
at the margin if and only if
.
The threshold has a direct economic reading. The more planned investment exceeds execution capacity, the lower the bar for preparation. Preparation becomes a priority precisely when funds outrun the means of execution, and the marginal return to preparation should rise with the square of the investment to absorption ratio.
6. The viability frontier
In the central calibration (Appendix, Table A1), no allocation of a fixed envelope of 12 lifts terminal capacity above 1.071 without preparation, while preparation with cuts the debt peak needed to reach
by about a quarter. We optimise the class
under the envelope for 29 values of
and report two objects, the maximal terminal capacity and the minimal debt peak needed to reach
(Figure 1).
Figure 1. Viability frontier of the transition. Left, maximal terminal capacity under an envelope of 12 as a function of . Right, minimal debt peak needed to reach
. Dashed lines show the best programme without preparation; dotted lines mark the entry thresholds of preparation. Synthetic simulations, no empirical data.
Table 2. Optimal allocations in the class , envelope of 12, central parameters (model computations, no empirical data).
| Max | Min peak for | |||||
| No preparation | 0 | 5.970 | 6.030 | 0 | 4.599 | 4.705 |
| 0.25 | 2.981 | 3.728 | 5.291 | 0.956 | 3.768 | 4.342 |
| 0.5 | 3.927 | 2.610 | 5.464 | 1.570 | 2.666 | 3.854 |
| 1 | 4.141 | 1.819 | 6.041 | 1.550 | 1.892 | 3.501 |
| 2 | 3.892 | 1.259 | 6.848 | 1.311 | 1.350 | 3.246 |
| 4 | 3.395 | 0.864 | 7.741 | 1.032 | 0.969 | 3.058 |
Three lessons follow. First, a target of 1.5 is infeasible without preparation whatever debt ceiling is accepted, and becomes feasible from with the same envelope. The target is reached not with more money but by creating a capacity that was missing, which is the dynamic counterpart of the opening formula of Section 3.
Second, preparation enters the debt-peak problem later than the capacity problem, at against 0.099. The reason is accounting. Preparation adds debt before it yields capacity, which weighs directly on the peak, so preparation that pays for the end state may not pay for the transition. With
the minimal peak falls from 9.163 to 6.852, a reduction of about 25 per cent.
Third, the analytical threshold of Proposition 6 is accurate. With and
it gives
, against 0.0994 found by bisection on the numerical optimum. The capacity-maximising allocations also show the mechanism at work. As
rises, investment shifts from period 0 to period 1, when the prepared absorptive capacity is available.
7. Testable implications and identification
The framework yields three predictions that can fail.
- Heterogeneity in the return to preparation. By Proposition 6, the marginal effect of preparation on delivered capacity should increase with the square of the ratio of planned investment to execution capacity. Projects launched by administrations already saturated by large programmes should benefit most.
- End state versus transition. Preparation that improves outcomes at completion may still be rejected when the binding constraint is peak financing. Programmes with tight interim financing limits should show lower preparation intensity than their expected returns justify.
- Effective rank. Countries with larger frozen instrument sets should display a higher effective degree
, computed from estimated multiplier matrices, and slower adjustment to multi-target consolidation plans.
A French regression discontinuity design. Since the public finance programming law of 31 December 2012 and Decree 2013-1211, central-government investment projects above 20 million euros require an ex ante socio-economic appraisal and enter a public inventory, and projects above 100 million euros require an independent counter-appraisal. About 150 projects totalling close to 100 billion euros of State funding were counter-appraised between 2013 and 2025 (République française, 2025). The 100 million euro threshold therefore creates a discontinuity in preparation intensity. Comparing projects just above and just below it on cost overruns, commissioning delays and abandonment, with robust local polynomial inference (Calonico, Cattaneo and Titiunik, 2014), would identify the effect of preparation on execution, the empirical counterpart of . The main threat is manipulation of declared project size to avoid or seek the counter-appraisal, which a density test at the threshold can detect (McCrary, 2008). Outcome measures should include abandoned and restructured projects, since preparation may change which projects are selected.
Cross-country evidence. World Bank project databases record preparation costs and durations together with outcome ratings, and have been used to separate country from project determinants of performance (Denizer, Kaufmann and Kraay, 2013). Combined with efficiency-adjusted capital stocks (Gupta et al., 2014), they allow a test of the interaction predicted by Proposition 6 across countries with large infrastructure programmes, including emerging economies such as Morocco.
Estimating . Multiplier matrices for tax, spending, investment and transfer instruments can be assembled from existing structural and local-projection estimates. Proposition 4 then requires reporting the effective degree with the range of thresholds over which it is stable, given the estimation uncertainty.
8. Conclusion
A policy problem under commitments is hyperstatic when its independent targets exceed the effective rank of its free instruments, and it becomes governable again when an investment in capacity adds an orthogonal direction at a cost and within a delay compatible with the transition. This sentence summarises the paper, and each of its parts is now measurable.
The static measure identifies how many directions are missing, which one, and how far a target lies from the attainable set. The opening formula shows that what matters in a new instrument is its orthogonal component, not its size. The dynamic model shows that preparation behaves like such an instrument, that its value is monotone in its conversion rate, and that it enters the optimum only above a simple threshold in the ratio of absorption to investment. It also shows that a capacity target unattainable with any allocation of a fixed budget can become attainable without additional money.
The analysis is partial equilibrium and deterministic. Prices, private responses, monetary policy and distribution are outside the model, and the numerical results are synthetic. The decisive next step is empirical, an estimate of from a credible source of variation such as the French counter-appraisal threshold. If that estimate is small, the model predicts that preparation should not be a priority, and the theory says so in advance. In the spirit of Sen (1999), the broader claim is that fiscal sustainability should be judged not only by the level of debt but also by the range of feasible futures a society preserves.
Declarations
Funding. This research received no specific grant from any funding agency.
Competing interests. The author declares no competing interests.
Data and code availability. All results are produced from the model equations and parameters reported in the Appendix. The Python code (NumPy, SciPy) and parameter files will be deposited in a public repository upon submission and are available from the author on request.
Use of AI-assisted tools. AI-assisted tools were used for drafting support, numerical verification and editing. The author reviewed all content and takes full responsibility for the work. This statement should be adapted to the policy of the target journal.
Acknowledgements. To be completed by the author.
Appendix. Parameters and replication
Table A1. Central parameters of the dynamic model (illustrative values).
| Parameter | Symbol | Value |
| Horizon | 10 periods (decisions | |
| Initial states | 0, 2, 0 | |
| Envelope on | 12 | |
| Saturation efficiency | 0.8 | |
| Depreciation of absorption | 0.05 | |
| Real interest rate | 0.03 | |
| Output per unit of capacity | 0.7 | |
| Marginal tax yield | 0.4 | |
| Operating cost per unit of capacity | 0.02 | |
| Maintenance intensity | 0.01 | |
| Depreciation function | ||
| Support transfers | 0 |
States are updated simultaneously from opening values, and period spending accrues interest from the next period. With these conventions the model reproduces the reference strategies exactly. Investing 12 at gives
and
; preparing 2 at
with
and investing 10 at
gives
,
and a debt peak of 12.06.
The example of Section 4 is computed by singular value decomposition in NumPy and checked with a linear feasibility programme in SciPy. The frontier of Section 6 is obtained by SLSQP with 25 to 30 random starts (seed 1) over , and cross-checked by exhaustive search on a 0.1 grid covering every admissible allocation of the envelope, which confirms the ranking and thresholds at grid resolution. Thresholds are located by bisection and Brent’s method.
References
Abiad, A., Furceri, D. and Topalova, P. (2015) The Macroeconomic Effects of Public Investment: Evidence from Advanced Economies. IMF Working Paper 15/95. Washington, DC: International Monetary Fund.
Aoki, M. (1975) ‘On a generalization of Tinbergen’s condition in the theory of policy to dynamic models’, The Review of Economic Studies, 42(2), pp. 293–296.
Aubin, J.-P. (1991) Viability Theory. Boston: Birkhäuser.
Aubin, J.-P., Aubin-Frankowski, P.-C. and Lozève, V. (2024) ‘Reintroducing time, money and constraints: viability to bridge the economic and monetary theories’, International Game Theory Review, 26(2), 2440001.
Bernanke, B.S. (1980) Irreversibility, Uncertainty, and Cyclical Investment. NBER Working Paper 502. Cambridge, MA: National Bureau of Economic Research.
Buffie, E.F., Berg, A., Pattillo, C., Portillo, R. and Zanna, L.-F. (2012) Public Investment, Growth, and Debt Sustainability: Putting Together the Pieces. IMF Working Paper 12/144. Washington, DC: International Monetary Fund.
Calonico, S., Cattaneo, M.D. and Titiunik, R. (2014) ‘Robust nonparametric confidence intervals for regression-discontinuity designs’, Econometrica, 82(6), pp. 2295–2326.
Collier, P. (2010) The Plundered Planet: Why We Must, and How We Can, Manage Nature for Global Prosperity. Oxford: Oxford University Press.
Denizer, C., Kaufmann, D. and Kraay, A. (2013) ‘Good countries or good projects? Macro and micro correlates of World Bank project performance’, Journal of Development Economics, 105, pp. 288–302.
Dixit, A.K. and Pindyck, R.S. (1994) Investment under Uncertainty. Princeton: Princeton University Press.
Flyvbjerg, B., Bruzelius, N. and Rothengatter, W. (2003) Megaprojects and Risk: An Anatomy of Ambition. Cambridge: Cambridge University Press.
Golub, G.H. and Van Loan, C.F. (2013) Matrix Computations. 4th edn. Baltimore: Johns Hopkins University Press.
Gupta, S., Kangur, A., Papageorgiou, C. and Wane, A. (2014) ‘Efficiency-adjusted public capital and growth’, World Development, 57, pp. 164–178.
Gurara, D., Kpodar, K., Presbitero, A.F. and Tessema, D. (2020) On the Capacity to Absorb Public Investment: How Much is Too Much? IMF Working Paper 20/48. Washington, DC: International Monetary Fund.
Hausmann, R., Rodrik, D. and Velasco, A. (2008) ‘Growth diagnostics’, in Serra, N. and Stiglitz, J.E. (eds) The Washington Consensus Reconsidered: Towards a New Global Governance. Oxford: Oxford University Press.
Kalman, R.E., Ho, Y.C. and Narendra, K.S. (1963) ‘Controllability of linear dynamical systems’, Contributions to Differential Equations, 1(2), pp. 189–213.
Leeper, E.M., Walker, T.B. and Yang, S.-C.S. (2010) ‘Government investment and fiscal stimulus’, Journal of Monetary Economics, 57(8), pp. 1000–1012.
McCrary, J. (2008) ‘Manipulation of the running variable in the regression discontinuity design: a density test’, Journal of Econometrics, 142(2), pp. 698–714.
McDonald, R. and Siegel, D. (1982) The Value of Waiting to Invest. NBER Working Paper 1019. Cambridge, MA: National Bureau of Economic Research.
Mundell, R.A. (1962) ‘The appropriate use of monetary and fiscal policy for internal and external stability’, IMF Staff Papers, 9(1), pp. 70–79.
Preston, A.J. (1974) ‘A dynamic generalization of Tinbergen’s theory of policy’, The Review of Economic Studies, 41(1), pp. 65–74.
Pritchett, L. (2000) ‘The tyranny of concepts: CUDIE (cumulated, depreciated, investment effort) is not capital’, Journal of Economic Growth, 5(4), pp. 361–384.
République française (2013) Décret n° 2013-1211 du 23 décembre 2013 relatif à la procédure d’évaluation des investissements publics. Paris: Journal officiel de la République française.
République française (2025) Rapport sur les grands projets d’investissement publics, annexe au projet de loi de finances pour 2026. Paris: Assemblée nationale. Available at: https://www.assemblee-nationale.fr/dyn/dyn/contenu/visualisation/1090010/file/16-Jaune2026_Investissements_Publics.pdf
Sen, A. (1999) Development as Freedom. Oxford: Oxford University Press.
Tinbergen, J. (1952) On the Theory of Economic Policy. Amsterdam: North-Holland.