The Hyperstatic Equation: Measuring Policy Over-Constraint and the Value of Building Execution Capacity

Ahmed Boutamo, Pr. Dr-Eng., PhD. Independent researcher and strategic advisor, Paris, France. ORCID 0009-0000-2145-1765 (https://orcid.org/0009-0000-2145-1765). Correspondence: aboutamo@gmail.com. Website: https://boutamo.org

Status: working paper, submitted or to be submitted for peer review. A French version of the argument appears in the author’s book L’Équation hyperstatique. Dette publique et capacités de transformation économique (2026).

Abstract

Governments that carry large stocks of commitments often report that they can no longer act, even when resources exist. This paper gives that complaint an exact and measurable form. Borrowing from structural mechanics, we define the degree of hyperstaticity of a policy problem as the number of independent targets minus the rank of the Jacobian of the instruments that commitments leave free. We show that a positive degree makes almost every target locally unattainable, derive a closed-form measure of how far a target lies from the attainable set, and give the exact intensity a new instrument needs to reopen a blocked direction, which depends only on its component orthogonal to existing instruments. An effective, threshold-based version of the degree is robust to estimation error in the multiplier matrix by Weyl’s inequality. We then embed the idea in a dynamic model of public investment with absorptive capacity and a debt ceiling at every date. Better conversion of preparation spending into execution capacity monotonically enlarges the viability kernel, and preparation enters the capacity-maximising programme if and only if its conversion rate exceeds the squared ratio of absorptive capacity to planned investment. In a calibrated illustration the threshold formula gives 0.0993 against a numerical optimum of 0.0994, and a capacity target that no allocation of a fixed budget can reach without preparation becomes reachable once conversion exceeds about 1.05. We outline a regression discontinuity design based on the French 100 million euro counter-appraisal threshold to estimate the key parameter.

Keywords: policy instruments and targets; Tinbergen rule; controllability; viability theory; public investment efficiency; absorptive capacity; fiscal space

JEL codes: E61, E62, H54, H63, C61

1. Introduction

This paper turns the intuition that a heavily committed economy “cannot move” into a quantity that can be computed, bounded and tested. High public debt, statutory spending, tax ceilings set by political acceptability and social floors each remove degrees of freedom from fiscal policy. The resulting situation is rarely one of absolute scarcity. Resources exist, but the instruments that could still be moved no longer span the directions in which policy needs to move.

Structural engineering has a precise word for a system with more constraints than its equilibrium equations can absorb. A beam clamped at both ends is hyperstatic, and its degree of hyperstaticity counts the redundant supports. We use the analogy in a disciplined way. A policy problem is hyperstatic when the number of independent targets exceeds the number of independent directions that free instruments can still produce. The degree of hyperstaticity counts the missing directions.

The counting idea is old. Tinbergen (1952) showed that policy requires at least as many independent instruments as targets, and Preston (1974) and Aoki (1975) extended the condition to dynamic models through the controllability rank of linear systems (Kalman, Ho and Narendra, 1963). The contribution of this paper lies elsewhere, in four results that make the counting operational for economies under commitments.

  1. A commitment-adjusted rank measure. We separate nominal from free instruments, so that legal, political and financial commitments enter the computation explicitly, and define the degree 8e381dd3 13ef 4a99 A070 2981017e71d7 (Definition 1 and Proposition 1).
  2. A distance and an opening formula. We measure how far a target lies from the attainable set and show that a new instrument reopens a blocked direction if and only if it has a non-zero orthogonal component, with a closed-form intensity (Propositions 2 and 3). Instrument power and instrument novelty are distinct.
  3. Robustness. A threshold version of the degree is invariant to estimation error smaller than the spectral gap, which makes the concept estimable from multiplier studies (Proposition 4).
  4. Instruments as produced capacity. In a dynamic model where preparation spending builds absorptive capacity with a lag and debt is capped at every date, better conversion monotonically enlarges the viability kernel (Proposition 5), and preparation enters the optimum exactly when its conversion rate exceeds the squared ratio of absorptive capacity to planned investment (Proposition 6).

The last result yields a sharp and falsifiable prediction. The marginal value of project preparation should rise with the square of the ratio between planned investment and execution capacity. It also explains why preparation that improves the end state of a programme can still be rejected when the binding constraint is the peak of debt during the transition.

All numerical results are synthetic and serve to verify the algebra and to size the mechanism. They are not estimates for any country. Section 2 reviews related work. Section 3 develops the static measure and Section 4 illustrates it. Section 5 introduces the dynamic model and its viability results, and Section 6 computes the viability frontier. Section 7 derives testable implications and an identification strategy, and Section 8 concludes.

2. Related literature

The paper connects four literatures that rarely meet, namely the theory of economic policy, viability theory, public investment efficiency and project appraisal.

Targets and instruments. Tinbergen (1952) established the counting rule, and Mundell (1962) showed that the assignment of instruments to targets matters for stability. Preston (1974) and Aoki (1975) generalised the rule to dynamic linear systems, where the relevant object becomes the controllability matrix of Kalman, Ho and Narendra (1963). We take the rank formulation as given. What we add is the explicit removal of instruments frozen by commitments, a metric notion of distance to the attainable set, the opening formula for a new instrument and a robustness result that links the measure to estimated multipliers.

Viability. Aubin (1991) defined the viability kernel as the set of states from which at least one evolution respects state constraints forever, and Aubin, Aubin-Frankowski and Lozève (2024) apply viability to monetary and economic theory. Our dynamic notion of hyperstaticity is a state lying outside the kernel for the available instruments. The new element is a monotone comparative static in the parameter that converts preparation into execution capacity, and a closed-form entry threshold.

Public investment efficiency and absorption. Pritchett (2000) showed that cumulated public investment effort is not capital, and Gupta et al. (2014) built efficiency-adjusted public capital stocks that differ widely across countries. Buffie et al. (2012) model investment, debt and absorptive constraints jointly in low-income countries, and Gurara et al. (2020) estimate that unit costs rise with the scale of public investment. Leeper, Walker and Yang (2010) show that implementation delays change the macroeconomic effect of government investment. Abiad, Furceri and Topalova (2015) find that the output effect of public investment depends on efficiency. Collier (2010) argued for “investing in investing”, that is, building the capacity to invest before investing. Our model formalises this idea with an explicit budget, a lag and a debt ceiling at every date, and derives when it pays.

Irreversibility and appraisal. The value of waiting and information under irreversibility is established (Bernanke, 1980; McDonald and Siegel, 1982; Dixit and Pindyck, 1994). Large projects suffer systematic cost overruns and delays (Flyvbjerg, Bruzelius and Rothengatter, 2003), and project outcomes depend on both country and project factors (Denizer, Kaufmann and Kraay, 2013). These results motivate treating preparation as a capacity-building input whose return must be estimated rather than assumed.

The idea of a binding constraint that masks others echoes growth diagnostics (Hausmann, Rodrik and Velasco, 2008). Our measure gives it a matrix form, in which the missing direction is identified by the orthogonal complement of the image of the free Jacobian.

3. The degree of hyperstaticity

3.1 Set-up

Let 29413e0b Fff1 414f Aacc 1f9ca7552c6f collect 20911f04 2861 456f A942 F022211018f6 policy targets and 1b313b2b C8fa 4254 89cb 8a949cb8820d collect 13aef790 D03d 4679 86e5 Cfb178cbafa5 instruments. Around a reference point, the local response of targets to instruments is linear:

An instrument is frozen over the decision horizon when it cannot be moved, because of a legal commitment, a bound already reached or a documented acceptability limit. Let 9f7caf9e 7b6e 40f3 B41a 5485e2596c82 denote the set of free instruments and 479179b7 F58b 412e 8d90 Ec21f9a51509 the 453fb1f7 A977 42cb B091 7df66d863be9 submatrix of their columns. Frozen instruments are not absent from the economy. They are absent from the set of directions policy can use.

Definition 1 (degree of hyperstaticity).

The policy problem is isostatic when Ec500aac 4402 45f9 8707 B78bde8b634d, hyperstatic when D5e6acab E903 46bd 812d 3e15edca2305 and redundant when E385a862 730b 4ad6 B66c 645eb3481475. The degree 7ecb9cee 1c02 4596 B02d E05a9c9dc037 counts the directions of target space that no combination of free instruments can produce. Unfreezing an instrument or creating a new one can only lower 7ecb9cee 1c02 4596 B02d E05a9c9dc037, never raise it.

3.2 Hyperstaticity makes almost every target unattainable

Proposition 1. If D5e6acab E903 46bd 812d 3e15edca2305, the set of locally attainable target changes, 43691e3d 03ab 47a0 851c 534d3c56343a, is a linear subspace of dimension E1261aa7 6e3d 45e2 A470 500ae299b32d. It has Lebesgue measure zero in Fe9e4b56 5b90 4ac4 Bcc6 9607aef9fe7a, so for almost every 2993df41 1cfc 4968 Beba 494d1a7a37a8 the system 1ebd92da Bfc7 4529 990f 0b0c8e5aa50d has no solution.

Proof. 43691e3d 03ab 47a0 851c 534d3c56343a has dimension 8fd8b213 Ea67 4f71 B015 2f9a72cec92f. A proper linear subspace of Fe9e4b56 5b90 4ac4 Bcc6 9607aef9fe7a is closed with empty interior and Lebesgue measure zero. Hence the set of targets without a local solution has full measure. 40844cdc Ec73 4970 A9a3 0f8a2c49bc5e

The result is local. Box bounds on instruments turn the attainable set into a zonotope inside 43691e3d 03ab 47a0 851c 534d3c56343a, which only shrinks it, so Proposition 1 holds a fortiori. Large non-linear changes are treated in Section 5.

3.3 Distance to the attainable set

The rank says whether a target can be met, not by how much it is missed. Let 26069e43 55b0 4af8 A434 53b487c5b579 be the orthogonal projector onto 43691e3d 03ab 47a0 851c 534d3c56343a.

Proposition 2 (inaccessibility gap). The minimal Euclidean miss of a target 2993df41 1cfc 4968 Beba 494d1a7a37a8 using free instruments is the norm of its component orthogonal to the attainable subspace:

When 5130ddd6 Bee0 4705 Ae0e 15761c452209, let 13aef790 D03d 4679 86e5 Cfb178cbafa5 be the unit normal to the hyperplane 43691e3d 03ab 47a0 851c 534d3c56343a. The gap then reduces to 85635b82 7b24 411c 98d4 188fcfd3ad95.

Proof. The least-squares problem is solved by the orthogonal projection of 2993df41 1cfc 4968 Beba 494d1a7a37a8 onto 43691e3d 03ab 47a0 851c 534d3c56343a, and the residual is Dcc31b08 Afed 4f36 Aee4 4cbde9e91862. When 5130ddd6 Bee0 4705 Ae0e 15761c452209 the orthogonal complement is spanned by 13aef790 D03d 4679 86e5 Cfb178cbafa5, so 6746d245 36e1 401b Befb 9ff4a02b1058. 40844cdc Ec73 4970 A9a3 0f8a2c49bc5e

Targets must be normalised before the gap is compared across domains, since 7aca1eae 49bf 4d67 B791 Ecd5d3cf04b5 inherits their units.

3.4 Opening a blocked direction

Suppose a new instrument becomes available, with marginal effects 3a5f99bc 1da1 4dd5 Bf15 C30bbdeba1b4. It may be a new policy, the unfreezing of an existing one or, as in Section 5, a capacity built by spending.

Proposition 3 (opening condition and intensity). Adding Baea7feb 2e38 48f3 B26d 18b19a7a6c3c to the free instruments lowers 7ecb9cee 1c02 4596 B02d E05a9c9dc037 by one if and only if D1261865 824d 4110 A37b 816375caecea. When 5130ddd6 Bee0 4705 Ae0e 15761c452209, the target 2993df41 1cfc 4968 Beba 494d1a7a37a8 becomes exactly attainable and the required intensity of the new instrument is unique:

Proof. 769e99b7 4884 4a14 907d 375bed2326af if and only if D04df3c6 Bd94 417e A5a7 8f2fad63c9a6, that is, if and only if D1261865 824d 4110 A37b 816375caecea. For 5130ddd6 Bee0 4705 Ae0e 15761c452209, premultiply Bdadff74 06ce 4fc4 931a 5e856ed0e25c by 5a2f1b80 1a33 432f 9c72 50d87ce087de. Since 13aef790 D03d 4679 86e5 Cfb178cbafa5 is orthogonal to every column of 479179b7 F58b 412e 8d90 Ec21f9a51509, D6c3156c 8cab 4c60 8e45 03e7c6b41584. If A174a882 258e 415d Be25 69cd99059e1f this fixes A2d22567 5355 485b B896 D351209c4588, and the remaining vector 7824ac53 94d7 46ed 9794 5f9e07016535 lies in 43691e3d 03ab 47a0 851c 534d3c56343a, so 75613a93 De2c 49a7 A320 D6ac50f9d44c exists. 40844cdc Ec73 4970 A9a3 0f8a2c49bc5e

We call 4a0f7559 Bab7 402e 927c 1d4fecc71efa the opening index. It separates instrument power, the norm of Baea7feb 2e38 48f3 B26d 18b19a7a6c3c, from instrument novelty, its orthogonal share. A powerful instrument that duplicates existing ones opens nothing, and the intensity it would need grows as Dfcd11fe 276c 4d06 A330 1322c9375bed.

3.5 Robustness to estimation error

In practice 89eaf9f0 D0f6 4a23 Bb05 354d5f3f3f6e is estimated from multiplier studies, and an estimated matrix almost surely has full rank even when the true one does not. A threshold version of the degree is therefore required. Let 91ef625d Ec78 45e6 B4af 5a164da11d48 be the singular values of 479179b7 F58b 412e 8d90 Ec21f9a51509.

Definition 2 (effective degree at threshold 9026dc67 1eb1 446b B70d 7d61164ea72a).

Proposition 4. Let the estimate satisfy 38dd53b7 3c05 442d B5dd Dd8399319379. If no true singular value lies in Ffd7cef8 2156 4563 82a6 B89ce43bf322, the effective degree computed on the estimate equals the true effective degree.

Proof. By Weyl’s inequality for singular values, Cb879d98 1c43 481f 93b3 4c3c7ef1a001 for every 52bc4e97 47ed 4a2c Ba8e Ac98e62b082b (Golub and Van Loan, 2013). A true value above Aa74f828 C42a 45fa A6cb 8f2012437ea2 stays above 9026dc67 1eb1 446b B70d 7d61164ea72a, and a true value at or below E66cf6ca 0eb8 41a6 9887 Fbbfc1c86aa2 stays at or below 9026dc67 1eb1 446b B70d 7d61164ea72a. 40844cdc Ec73 4970 A9a3 0f8a2c49bc5e

The proposition makes the concept estimable. Given multipliers with confidence bands, one can report 22df18b9 9036 4ea9 B49b 5a35d44c715f together with the range of thresholds over which it is stable. A diagnosis that changes with a small move of 9026dc67 1eb1 446b B70d 7d61164ea72a signals a near-collinear instrument set rather than a clean hyperstatic structure.

4. A three-objective illustration

A stylised example shows that two frozen instruments are enough to make the recovery direction itself unattainable, and that a preparation instrument with an opening index of 0.69 restores it. All coefficients are hypothetical and chosen only to verify the algebra.

The three normalised targets are the primary balance, productive capacity and the residual income of the first decile after essential spending. Four instruments exist nominally. Taxation is frozen at an acceptability bound and current spending by statutory commitments.

Table 1. Hypothetical marginal effects 39a64508 7831 4b81 A987 Ba83ef5a069f (author’s construction, no estimation).

TargetTax (frozen)Current spending (frozen)InvestmentTargeted transfer
Primary balance0.90−1.00−1.00−1.00
Productive capacity−0.200.100.600.05
Residual income, first decile−0.400.300.051.00

With all four instruments 89eaf9f0 D0f6 4a23 Bb05 354d5f3f3f6e has rank 3, with singular values 2.2037, 0.7522 and 0.2303, and the problem would be isostatic. With the two free instruments the rank falls to 2 and 5130ddd6 Bee0 4705 Ae0e 15761c452209. The blocked direction is 2d98137e 2956 40c9 8170 1fb30d22603c, a simultaneous improvement of all three targets, which is precisely the recovery a government seeks.

Take the target 82c92d32 3e7e 450d 91d0 6493d3ce7bee, which improves the balance and capacity without hurting the poorest decile. Its inaccessibility gap is Ec3b39bd B210 4966 B423 94293e3c96d7, and the least-squares residual has the same norm. No combination of investment and transfers attains it.

Now add a preparation instrument with effects 670e7e48 20c3 4ffd 9ca4 C881ec21fe1d. It costs the balance but acts strongly on capacity. Its projection on the blocked direction is 117d68c5 F2e0 4d0d Bff9 2995e28dc830 and its opening index is E30e23cf B825 4cf6 9157 48846d2ad5bf. The degree drops to zero, and Proposition 3 gives 7f1883d5 0752 4e7e Bfc7 1f2b071d71ed. Solving the full system confirms this value, with investment at 8ac49e8b 7d33 4dbe B11c E3b65fa6c3cf and transfers at 68f5be13 F65e 4279 976e 3df85b6b027c, and a linear feasibility programme confirms that all intensities lie within an illustrative box of 974045b4 7bc2 4b23 A449 36bec0217fc9. The negative investment entry means that, in this example, preparation raises capacity enough to release investment in favour of the balance.

Finally consider an alternative instrument 23c4c0c8 Dc2b 4d07 A70d E8306fced2c0, almost collinear with investment. Its projection 3962df2e 7dd9 4051 Acdd 41dfa88fc361 is only 0.0196. The rank is formally 3 again, but the smallest singular value is 0.0138 and the required intensity exceeds 31 in absolute value. The problem is formally isostatic and practically hyperstatic, and 0a1a3876 Bfd4 41fb 9c04 98a7469d0309 for every threshold above 0.0138.

5. Dynamics: execution capacity as a produced instrument

5.1 The model

We now let the opening instrument be built rather than given. A programme is described relative to a baseline by three states at the start of period C7f47a68 277d 4cee 81f6 Ecb5362ad554: additional productive capacity 4adbd6d2 2d9c 4855 A143 Fcc429dd9b20, absorptive capacity 15c515ce D1f0 41c2 9faf D918c0b60666 and additional real debt 4817e306 C2e8 426f Bd67 361a3ea113b9. Decisions are preparation B734e741 0f77 484b 9891 F145d2229b1b, investment A1e6b7b5 9c21 49b5 Ba8e D3c3228385dd, a maintenance intensity 20911f04 2861 456f A942 F022211018f6 and support transfers 3518e0b9 3446 43b1 Bfbe 5a654f35d857. The states evolve as follows:

The saturation term D9a5def5 Ab90 463c 8487 Dafd4152b50a caps realised capacity at B20a0bbd E854 4ef3 908f 3c96e33d2f20 when investment outruns absorption, in line with the evidence that unit costs rise with investment scale (Gurara et al., 2020). Preparation decided at C7f47a68 277d 4cee 81f6 Ecb5362ad554 raises absorption only at 0b52edf1 931f 4744 A2a2 4c792fd25fe6. Capacity built during a period produces revenue 47981d5f 8856 4615 A8a1 C9855b1e8d14 only from the next period, so no revenue is anticipated. The parameter 3e633141 7a78 4b1b Aa69 9152f1ce4324 converts one unit of preparation spending into absorptive capacity. It is the dynamic counterpart of the opening index of Section 3.

5.2 Viability and dynamic hyperstaticity

Fix a horizon Dc3d1d89 E7d5 4515 Bd6e Deab46376fc1, an envelope 2707fb8b B843 416e Bb67 7d4acc0511c5 on cumulative preparation and investment, a debt ceiling A6b3d5d7 1190 4bc6 84b9 73420d80ed22 and a capacity target 59ff2a45 A4cd 4671 A78d F0f98f5ff892. A programme is admissible if 0cf4acf7 Cd76 466f 85eb 42f3746bf83c at every date, the envelope holds and E31d89d6 693e 40af B334 B9dd72acf3e0. The set of initial states from which an admissible programme exists is the viability kernel (Aubin, 1991). An economy is dynamically hyperstatic when its state lies outside the kernel for the instruments it can use. This replaces the counting of directions by the existence of trajectories while keeping the same meaning: commitments demand more than adjustment capacities can deliver within the time available.

5.3 Better conversion always enlarges the possible

Proposition 5 (monotonicity in 3e633141 7a78 4b1b Aa69 9152f1ce4324). Assume the net fiscal yield of capacity is positive, 05a50287 1d77 44e9 A93b A88a779125bf. For any fixed sequence of decisions, raising 3e633141 7a78 4b1b Aa69 9152f1ce4324 weakly raises 15c515ce D1f0 41c2 9faf D918c0b60666 and 4adbd6d2 2d9c 4855 A143 Fcc429dd9b20 and weakly lowers 4817e306 C2e8 426f Bd67 361a3ea113b9 at every date. Consequently the set of admissible programmes expands with 3e633141 7a78 4b1b Aa69 9152f1ce4324, the minimal debt peak needed to reach a given target is non-increasing in 3e633141 7a78 4b1b Aa69 9152f1ce4324, and the maximal capacity reachable under a given ceiling is non-decreasing in 3e633141 7a78 4b1b Aa69 9152f1ce4324.

Proof. By induction on C7f47a68 277d 4cee 81f6 Ecb5362ad554. 7e84f6c7 B142 40ec 93ee 614ea5c50c6a is non-decreasing in 3e633141 7a78 4b1b Aa69 9152f1ce4324, and each later 15c515ce D1f0 41c2 9faf D918c0b60666 inherits the order since 96fbf5e8 3017 49d6 9f1a 35b305ed7999. The map 91389d69 2d3d 48d1 9c8b 5eddc60289b5 is non-decreasing in 003f899b 1eef 4b97 8285 81413d3b9aa2 for D96ec302 Bf5a 4961 8c89 F479d8af6e46, and B0a51cd1 A05d 455d 906e D972fc05a198 preserves the order of 4adbd6d2 2d9c 4855 A143 Fcc429dd9b20. In (8), 4adbd6d2 2d9c 4855 A143 Fcc429dd9b20 enters with coefficient B787b6b0 5d7e 449c 82a4 A964db00ecb8, and 9bbb469a Adf1 490b B137 Fc9eb366636a preserves the order of 4817e306 C2e8 426f Bd67 361a3ea113b9. Any programme admissible at 3e633141 7a78 4b1b Aa69 9152f1ce4324 therefore remains admissible at every 432d1817 8074 456b B1ee 11894940f58d. 40844cdc Ec73 4970 A9a3 0f8a2c49bc5e

The practical consequence is that a credible lower bound on 3e633141 7a78 4b1b Aa69 9152f1ce4324 delivers a guaranteed inner approximation of the viability kernel. Parameter uncertainty translates directly into a conservative frontier.

5.4 When preparation enters the optimum

Consider the programme class used in the simulations, with preparation 5e9ad868 1db2 4691 A6aa 7f9bff2acdc2 in period 0, investment 148b5921 A73f 4f41 Aae0 3b2873446d1f and 34692697 6191 41be A32e 201cbf2dca4b in periods 0 and 1, and the envelope B53fd7d9 0f5c 4cb7 81b5 7f42e769d5ab. Let 85cad081 35b3 47bf Bfe1 C0a8a35a98c8 maximise terminal capacity 3c262386 5d73 41dc B4cd C71413d4817c without preparation, and suppose this optimum is interior with 0ff6d24f 951c 4bdf 8215 E77968886d92.

Proposition 6 (entry threshold). A small amount of preparation raises maximal terminal capacity if

and does not raise it if the reverse strict inequality holds.

Proof. At the interior optimum without preparation, the first-order conditions equalise the discounted marginal products of 148b5921 A73f 4f41 Aae0 3b2873446d1f and 34692697 6191 41be A32e 201cbf2dca4b with the multiplier 48f68489 544f 4553 8bd3 5e900777a451 of the envelope. The marginal product of 34692697 6191 41be A32e 201cbf2dca4b in period 1 is 0493da44 93da 4a10 8198 F048feb75073. A unit of preparation raises 681e70af Af57 468e Bc7b 486405c39f05 by 3e633141 7a78 4b1b Aa69 9152f1ce4324 and the capacity built in period 1 by 5909d18c A1c4 4b14 8bbb B1f72c068a23, at a cost of one unit of envelope, worth 48f68489 544f 4553 8bd3 5e900777a451. Both effects reach the horizon through the same depreciation factor Ee7b732f 6196 4ddb 8ec2 B80a575edbfe. Preparation improves 3c262386 5d73 41dc B4cd C71413d4817c at the margin if and only if 650bfa37 E487 46ea 99d2 4c5bce1f982f. 40844cdc Ec73 4970 A9a3 0f8a2c49bc5e

The threshold has a direct economic reading. The more planned investment exceeds execution capacity, the lower the bar for preparation. Preparation becomes a priority precisely when funds outrun the means of execution, and the marginal return to preparation should rise with the square of the investment to absorption ratio.

6. The viability frontier

In the central calibration (Appendix, Table A1), no allocation of a fixed envelope of 12 lifts terminal capacity above 1.071 without preparation, while preparation with A77b9523 Cd95 4431 9621 Ab920e0ed54a cuts the debt peak needed to reach Bd354460 4290 4512 9d51 8ad08edd309e by about a quarter. We optimise the class 1b14ab21 267d 4e32 B03b 9d8c6c8139ea under the envelope for 29 values of 3e633141 7a78 4b1b Aa69 9152f1ce4324 and report two objects, the maximal terminal capacity and the minimal debt peak needed to reach Bd354460 4290 4512 9d51 8ad08edd309e (Figure 1).

Figure 1. Viability frontier of the transition. Left, maximal terminal capacity under an envelope of 12 as a function of 16f4f47d 7a1e 4bda A2c8 60e2509aeb90. Right, minimal debt peak needed to reach 3ab1b975 30f2 4427 B969 Be07470b8bc4. Dashed lines show the best programme without preparation; dotted lines mark the entry thresholds of preparation. Synthetic simulations, no empirical data.

Table 2. Optimal allocations in the class 2e3d3192 7d08 4de6 Ae6d 992c28a739b7, envelope of 12, central parameters (model computations, no empirical data).

B47a2a3e 7472 401a A8c9 17bcd65de750Max E5ad4c86 F542 4c50 8f7f E82c5b4aa38a: Dfc0b302 Bfe3 4163 8f44 C011d72e5de0B44089c9 8942 42e1 B4ef 0bf5c7c34f5908e10b62 F008 4713 Ab80 67d1ab59fd18Min peak for 108cfe72 7a54 4b63 82cc 9a6bd6d9f191: Dfc0b302 Bfe3 4163 8f44 C011d72e5de0B44089c9 8942 42e1 B4ef 0bf5c7c34f5908e10b62 F008 4713 Ab80 67d1ab59fd18
No preparation05.9706.03004.5994.705
0.252.9813.7285.2910.9563.7684.342
0.53.9272.6105.4641.5702.6663.854
14.1411.8196.0411.5501.8923.501
23.8921.2596.8481.3111.3503.246
43.3950.8647.7411.0320.9693.058

Three lessons follow. First, a target of 1.5 is infeasible without preparation whatever debt ceiling is accepted, and becomes feasible from 56657129 01eb 44a1 8812 Bdb98ad2c270 with the same envelope. The target is reached not with more money but by creating a capacity that was missing, which is the dynamic counterpart of the opening formula of Section 3.

Second, preparation enters the debt-peak problem later than the capacity problem, at 95bf0a92 9b42 49b1 8504 589f169b60e5 against 0.099. The reason is accounting. Preparation adds debt before it yields capacity, which weighs directly on the peak, so preparation that pays for the end state may not pay for the transition. With A77b9523 Cd95 4431 9621 Ab920e0ed54a the minimal peak falls from 9.163 to 6.852, a reduction of about 25 per cent.

Third, the analytical threshold of Proposition 6 is accurate. With 60f33f1a E426 43b8 Ae0e 4ab1c7435ba0 and 70048742 934e 4f7f 8940 De563c555891 it gives F4193506 A0dc 4041 A413 429e29b5592a, against 0.0994 found by bisection on the numerical optimum. The capacity-maximising allocations also show the mechanism at work. As 3e633141 7a78 4b1b Aa69 9152f1ce4324 rises, investment shifts from period 0 to period 1, when the prepared absorptive capacity is available.

7. Testable implications and identification

The framework yields three predictions that can fail.

  1. Heterogeneity in the return to preparation. By Proposition 6, the marginal effect of preparation on delivered capacity should increase with the square of the ratio of planned investment to execution capacity. Projects launched by administrations already saturated by large programmes should benefit most.
  2. End state versus transition. Preparation that improves outcomes at completion may still be rejected when the binding constraint is peak financing. Programmes with tight interim financing limits should show lower preparation intensity than their expected returns justify.
  3. Effective rank. Countries with larger frozen instrument sets should display a higher effective degree F513ee16 9765 4981 8172 B5e4662b6924, computed from estimated multiplier matrices, and slower adjustment to multi-target consolidation plans.

A French regression discontinuity design. Since the public finance programming law of 31 December 2012 and Decree 2013-1211, central-government investment projects above 20 million euros require an ex ante socio-economic appraisal and enter a public inventory, and projects above 100 million euros require an independent counter-appraisal. About 150 projects totalling close to 100 billion euros of State funding were counter-appraised between 2013 and 2025 (République française, 2025). The 100 million euro threshold therefore creates a discontinuity in preparation intensity. Comparing projects just above and just below it on cost overruns, commissioning delays and abandonment, with robust local polynomial inference (Calonico, Cattaneo and Titiunik, 2014), would identify the effect of preparation on execution, the empirical counterpart of 3e633141 7a78 4b1b Aa69 9152f1ce4324. The main threat is manipulation of declared project size to avoid or seek the counter-appraisal, which a density test at the threshold can detect (McCrary, 2008). Outcome measures should include abandoned and restructured projects, since preparation may change which projects are selected.

Cross-country evidence. World Bank project databases record preparation costs and durations together with outcome ratings, and have been used to separate country from project determinants of performance (Denizer, Kaufmann and Kraay, 2013). Combined with efficiency-adjusted capital stocks (Gupta et al., 2014), they allow a test of the interaction predicted by Proposition 6 across countries with large infrastructure programmes, including emerging economies such as Morocco.

Estimating 22df18b9 9036 4ea9 B49b 5a35d44c715f. Multiplier matrices for tax, spending, investment and transfer instruments can be assembled from existing structural and local-projection estimates. Proposition 4 then requires reporting the effective degree with the range of thresholds over which it is stable, given the estimation uncertainty.

8. Conclusion

A policy problem under commitments is hyperstatic when its independent targets exceed the effective rank of its free instruments, and it becomes governable again when an investment in capacity adds an orthogonal direction at a cost and within a delay compatible with the transition. This sentence summarises the paper, and each of its parts is now measurable.

The static measure identifies how many directions are missing, which one, and how far a target lies from the attainable set. The opening formula shows that what matters in a new instrument is its orthogonal component, not its size. The dynamic model shows that preparation behaves like such an instrument, that its value is monotone in its conversion rate, and that it enters the optimum only above a simple threshold in the ratio of absorption to investment. It also shows that a capacity target unattainable with any allocation of a fixed budget can become attainable without additional money.

The analysis is partial equilibrium and deterministic. Prices, private responses, monetary policy and distribution are outside the model, and the numerical results are synthetic. The decisive next step is empirical, an estimate of 3e633141 7a78 4b1b Aa69 9152f1ce4324 from a credible source of variation such as the French counter-appraisal threshold. If that estimate is small, the model predicts that preparation should not be a priority, and the theory says so in advance. In the spirit of Sen (1999), the broader claim is that fiscal sustainability should be judged not only by the level of debt but also by the range of feasible futures a society preserves.

Declarations

Funding. This research received no specific grant from any funding agency.

Competing interests. The author declares no competing interests.

Data and code availability. All results are produced from the model equations and parameters reported in the Appendix. The Python code (NumPy, SciPy) and parameter files will be deposited in a public repository upon submission and are available from the author on request.

Use of AI-assisted tools. AI-assisted tools were used for drafting support, numerical verification and editing. The author reviewed all content and takes full responsibility for the work. This statement should be adapted to the policy of the target journal.

Acknowledgements. To be completed by the author.

Appendix. Parameters and replication

Table A1. Central parameters of the dynamic model (illustrative values).

ParameterSymbolValue
Horizon2eb70830 D6f9 49bc B680 C325d5fdd8a810 periods (decisions 7ee13ffb Cc55 4f25 8eed 70895125eb46)
Initial states90eac8b3 82a4 4482 834f 1fccf508215d0, 2, 0
Envelope on 1ac5401a 481b 485c 9bac 286e71fd3817F85c07e0 3688 4ab7 8888 292e6a2d13e312
Saturation efficiency341388b5 E7fc 430c A127 C2817f2f3a5b0.8
Depreciation of absorption9c3f7289 79fe 44e9 83c1 F6e85e20ff750.05
Real interest rate62e27f94 11f6 4277 9a87 8793705b66730.03
Output per unit of capacityA87c62e3 626a 4206 A064 34e86ce67f800.7
Marginal tax yield38c9dc25 6530 4438 Ac14 76f3baa6ba960.4
Operating cost per unit of capacityBffa370d E1d5 4751 B7b2 A542d0b7be680.02
Maintenance intensityA81d25e7 641b 42b2 A14a 4041c9a1d4a80.01
Depreciation function14f301c7 48f5 4727 93a1 75c999c84f0242944296 17fc 4e1c 89db 1c6192536ceb
Support transfers2ecc5630 D5ce 4236 A048 A1ec4e2f3a0e0

States are updated simultaneously from opening values, and period spending accrues interest from the next period. With these conventions the model reproduces the reference strategies exactly. Investing 12 at D5df3f4b 79ff 492b B1da 8f2e4c65af8c gives 3d8c6e1c E855 4f38 B5e6 B4f98c1210f9 and D8663cfa 84f3 40dd 8be9 5963142547e9; preparing 2 at D5df3f4b 79ff 492b B1da 8f2e4c65af8c with F7af9877 Dbc6 4c62 Af03 6fa95a1e6439 and investing 10 at 159d1f2b D08c 4a0a A56d E8ae56cab567 gives F8892efa 530c 4603 8181 915b86ff81bc, E7a134ff A5dc 4eba Ab9c 5de0ec7ae3f0 and a debt peak of 12.06.

The example of Section 4 is computed by singular value decomposition in NumPy and checked with a linear feasibility programme in SciPy. The frontier of Section 6 is obtained by SLSQP with 25 to 30 random starts (seed 1) over 1b14ab21 267d 4e32 B03b 9d8c6c8139ea, and cross-checked by exhaustive search on a 0.1 grid covering every admissible allocation of the envelope, which confirms the ranking and thresholds at grid resolution. Thresholds are located by bisection and Brent’s method.

References

Abiad, A., Furceri, D. and Topalova, P. (2015) The Macroeconomic Effects of Public Investment: Evidence from Advanced Economies. IMF Working Paper 15/95. Washington, DC: International Monetary Fund.

Aoki, M. (1975) ‘On a generalization of Tinbergen’s condition in the theory of policy to dynamic models’, The Review of Economic Studies, 42(2), pp. 293–296.

Aubin, J.-P. (1991) Viability Theory. Boston: Birkhäuser.

Aubin, J.-P., Aubin-Frankowski, P.-C. and Lozève, V. (2024) ‘Reintroducing time, money and constraints: viability to bridge the economic and monetary theories’, International Game Theory Review, 26(2), 2440001.

Bernanke, B.S. (1980) Irreversibility, Uncertainty, and Cyclical Investment. NBER Working Paper 502. Cambridge, MA: National Bureau of Economic Research.

Buffie, E.F., Berg, A., Pattillo, C., Portillo, R. and Zanna, L.-F. (2012) Public Investment, Growth, and Debt Sustainability: Putting Together the Pieces. IMF Working Paper 12/144. Washington, DC: International Monetary Fund.

Calonico, S., Cattaneo, M.D. and Titiunik, R. (2014) ‘Robust nonparametric confidence intervals for regression-discontinuity designs’, Econometrica, 82(6), pp. 2295–2326.

Collier, P. (2010) The Plundered Planet: Why We Must, and How We Can, Manage Nature for Global Prosperity. Oxford: Oxford University Press.

Denizer, C., Kaufmann, D. and Kraay, A. (2013) ‘Good countries or good projects? Macro and micro correlates of World Bank project performance’, Journal of Development Economics, 105, pp. 288–302.

Dixit, A.K. and Pindyck, R.S. (1994) Investment under Uncertainty. Princeton: Princeton University Press.

Flyvbjerg, B., Bruzelius, N. and Rothengatter, W. (2003) Megaprojects and Risk: An Anatomy of Ambition. Cambridge: Cambridge University Press.

Golub, G.H. and Van Loan, C.F. (2013) Matrix Computations. 4th edn. Baltimore: Johns Hopkins University Press.

Gupta, S., Kangur, A., Papageorgiou, C. and Wane, A. (2014) ‘Efficiency-adjusted public capital and growth’, World Development, 57, pp. 164–178.

Gurara, D., Kpodar, K., Presbitero, A.F. and Tessema, D. (2020) On the Capacity to Absorb Public Investment: How Much is Too Much? IMF Working Paper 20/48. Washington, DC: International Monetary Fund.

Hausmann, R., Rodrik, D. and Velasco, A. (2008) ‘Growth diagnostics’, in Serra, N. and Stiglitz, J.E. (eds) The Washington Consensus Reconsidered: Towards a New Global Governance. Oxford: Oxford University Press.

Kalman, R.E., Ho, Y.C. and Narendra, K.S. (1963) ‘Controllability of linear dynamical systems’, Contributions to Differential Equations, 1(2), pp. 189–213.

Leeper, E.M., Walker, T.B. and Yang, S.-C.S. (2010) ‘Government investment and fiscal stimulus’, Journal of Monetary Economics, 57(8), pp. 1000–1012.

McCrary, J. (2008) ‘Manipulation of the running variable in the regression discontinuity design: a density test’, Journal of Econometrics, 142(2), pp. 698–714.

McDonald, R. and Siegel, D. (1982) The Value of Waiting to Invest. NBER Working Paper 1019. Cambridge, MA: National Bureau of Economic Research.

Mundell, R.A. (1962) ‘The appropriate use of monetary and fiscal policy for internal and external stability’, IMF Staff Papers, 9(1), pp. 70–79.

Preston, A.J. (1974) ‘A dynamic generalization of Tinbergen’s theory of policy’, The Review of Economic Studies, 41(1), pp. 65–74.

Pritchett, L. (2000) ‘The tyranny of concepts: CUDIE (cumulated, depreciated, investment effort) is not capital’, Journal of Economic Growth, 5(4), pp. 361–384.

République française (2013) Décret n° 2013-1211 du 23 décembre 2013 relatif à la procédure d’évaluation des investissements publics. Paris: Journal officiel de la République française.

République française (2025) Rapport sur les grands projets d’investissement publics, annexe au projet de loi de finances pour 2026. Paris: Assemblée nationale. Available at: https://www.assemblee-nationale.fr/dyn/dyn/contenu/visualisation/1090010/file/16-Jaune2026_Investissements_Publics.pdf

Sen, A. (1999) Development as Freedom. Oxford: Oxford University Press.

Tinbergen, J. (1952) On the Theory of Economic Policy. Amsterdam: North-Holland.

Laisser un commentaire

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *

Retour en haut